Thread: Job well done
View Single Post
Old 1st December 2008, 02:05 AM   #1 (permalink)
Paulscatt
Talk Angling Moderator
Talk Angling Life Member
 
Paulscatt's Avatar
 
Join Date: Aug 2006
Location: Merseyside
Posts: 2,292
Blog Entries: 1
Paulscatt is on a distinguished road
Default Job well done

Managed to stand on my No.4 section on my clubs F & F. Not the 1st time and i suppose it wont be the last . Lucky for me that I have 2x short No. 4's which enabled me to fish the match.

I made enquiry's as to the cost of a replacement section for my MAP Definition. It was £60 and i would not have it until January! Wasn't to impressed with that so I decided to have it repaired instead. I took it to North West Pole Repairs together with a broken No3 section I damaged at Whiteacres some months previously. I had them both repaired for less than the price of a new No.4. Collected them both today and i'm well pleased with the repairs. Quick turn around and friendly service. Well worth considering if the cost of a new section makes your toes curl
__________________
Paulscatt is offline   Reply With Quote